G6 Host-Bridge Callback Semantics Closure Report
Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-callback-semantics-plan.md
Result
This plan is closed with one bounded callback completion model:
okpartialblockederror
What Was Closed
G6callback completion logic is no longer implicit- the bounded state priority is now explicit
- one bounded follow-up
design + plannow exists
Hold Result
The following direction remains untouched:
G8 local-doc prerequisites
Next Step
Execute the bounded G6 host-bridge callback state verification plan rather than reopening this callback-semantics slice.