929 B
929 B
G6 Host-Bridge Entry Gate Report
Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-gate-plan.md
Result
This bounded slice defines the future G6 entry gate in three hard conditions:
host-bridge-action-invocation-definedcallback-request-completion-definedcallback-state-verification-targets-defined
Soft Conditions
The following remain explicitly outside the hard gate:
host-runtime-transport-implementationreal-sample-execution-proof
Fail-Close Reasons
If a future G6 entry slice opens without the hard conditions, it should fail closed with:
g6_bridge_invocation_semantics_missingg6_callback_completion_semantics_missingg6_callback_state_targets_missing
Follow-Up
The next bounded step is:
G6 host-bridge entry gate verification