Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-prerequisites-closure-report.md

749 B

G6 Host-Bridge Prerequisites Closure Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-prerequisites-plan.md

Result

This plan is closed with one bounded blocked capability:

  1. host-bridge-real-execution-semantics

What Was Closed

  1. G6 prerequisite pressure is no longer broad or implicit
  2. the minimum missing capability is now explicit
  3. one bounded follow-up design + plan now exists

Hold Result

The following direction remains untouched:

  1. G8 local-doc prerequisites

Next Step

Execute the bounded G6 host-bridge execution semantics plan rather than reopening this prerequisites slice.