1.3 KiB
1.3 KiB
G6 Host-Bridge Entry Gate Design
Date: 2026-04-19 Status: Draft Upstream Report: 2026-04-19-g6-host-bridge-entry-readiness-report.md
1. Intent
This design defines the next bounded slice after G6 host-bridge entry readiness.
The target is:
G6 host-bridge entry gate
2. Why This Slice
The semantic readiness criteria are now explicit.
The next bounded pressure is:
- turn those criteria into a bounded future entry gate without opening real execution
3. Scope Boundary
This design is limited to gate modeling only.
It may include:
- defining pass/fail gate conditions for a future
G6entry slice - defining which readiness criteria are hard blockers
- defining how the gate narrows later real-sample entry
It must not include:
- executing a
G6real sample - implementing host-runtime directly
- opening
G8 - reopening
G7
4. Target Outcome
The bounded target outcome is one state:
- one bounded
G6 host-bridge entry gateplan
5. Exit Condition
This design is complete when implementation can be bounded to one plan that:
- freezes gate-model scope
- defines bounded gate conditions
- emits one bounded follow-up plan