2.2 KiB
Scene Skill 102 Final Materialization Report
Date: 2026-04-19 Plan:
2026-04-19-scene-skill-102-final-materialization-plan.md
Scope
This plan materialized the final skill package set for the current 102 scene framework closure.
Existing examples/* follow-up roots were not cleaned or modified. The final materialization was written to:
D:/data/ideaSpace/rust/sgClaw/claw-new/examples/scene_skill_102_final_materialization_2026-04-19
Summary
| Metric | Count |
|---|---|
| total scenes | 102 |
| attempted | 102 |
| generated skill directories | 102 |
| required file checks passed | 101 |
| failures | 1 |
Duration: 2036.246 seconds
Readiness Distribution
| Readiness | Count |
|---|---|
A |
100 |
C |
2 |
Archetype Distribution
| Archetype | Count |
|---|---|
host_bridge_workflow |
27 |
local_doc_pipeline |
5 |
multi_endpoint_inventory |
2 |
multi_mode_request |
10 |
page_state_eval |
2 |
paginated_enrichment |
51 |
single_request_enrichment |
5 |
Assets
tests/fixtures/generated_scene/scene_skill_102_final_materialization_manifest_2026-04-19.jsontests/fixtures/generated_scene/scene_skill_102_final_materialization_failures_2026-04-19.jsonD:/data/ideaSpace/rust/sgClaw/claw-new/examples/scene_skill_102_final_materialization_2026-04-19
Failures
| Scene id | Scene name | Error | Missing files |
|---|---|---|---|
sweep-012-scene |
业扩报装管理制度 |
generator-exit-nonzero |
SKILL.toml, SKILL.md, scene.toml, scripts/* |
Closure
This materialization plan published the required final materialization assets: a 102-row manifest, an explicit failures asset, the isolated output root, and this report.
The final materialized skill asset set is not yet 102/102 complete because sweep-012-scene failed package materialization and is missing SKILL.toml, SKILL.md, scene.toml, and scripts/*.
Next work should not start static/mock validation yet. It should first use a separate bounded recovery plan for sweep-012-scene, then refresh this final materialization manifest. This plan does not perform recovery, static, mock, or production validation.