G6 Host Bridge Workflow Plan

Date: 2026-04-18 Status: Initial implementation slice

Plan Intent

Start the G6 line after G1-E second-sample reuse has been validated.

This plan implements the first safe slice only: classification, evidence separation, readiness gates, and fail-closed behavior.

Phase 0: Boundary Freeze

Tasks:

  1. keep 电能表现场检验完成率指标报表 as the P0 boundary sample
  2. define the repo-local representative fixture
  3. keep G6 separate from G1, G1-E, G3, G7, and G8

Deliverables:

  1. G6 design doc
  2. G6 plan doc
  3. repo-local representative fixture

Acceptance criteria:

  1. G6 is no longer discussed as a G1 candidate
  2. G6 is not treated as a generic localhost-pollution case

Phase 1: Analyzer Classification

Tasks:

  1. add host_bridge_workflow as a workflow archetype
  2. detect explicit host bridge actions
  3. keep localhost:* as supporting host-runtime evidence
  4. ensure explicit host bridge signals outrank G1-E
  5. ensure ordinary localhost export noise does not become G6

Acceptance criteria:

  1. g6_host_bridge_workflow fixture classifies as host_bridge_workflow
  2. bootstrap_localhost_pollution remains a non-G6 business scene

Phase 2: Fail-Closed Gate

Tasks:

  1. add readiness risks for missing or unsupported G6 contract
  2. add g6_host_bridge_detected
  3. add g6_fail_closed
  4. block generation before runnable output

Acceptance criteria:

  1. G6 generation returns a controlled error
  2. error message includes host_bridge_workflow
  3. no pseudo-runnable skill is produced

Phase 3: Regression

Tasks:

  1. run scene generator regression
  2. run family regression
  3. run family policy regression
  4. run canonical regression

Acceptance criteria:

  1. all target regressions pass
  2. no G1-E/G3/G2 behavior regresses

Next Step

After this safe G6 slice, continue to G7 多接口盘点汇总型 boundary assessment unless G6 runtime implementation becomes the selected priority.