G3 Residual Contract Closure Plan
Date: 2026-04-19 Status: Draft Parent Framework Plan:
docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Route:Route 2: G3 / paginated_enrichmentParent Layer:Layer C + Layer DUpstream Design:docs/superpowers/specs/2026-04-19-g3-residual-contract-closure-design.md
Plan Intent
Implement the final bounded Route 2 slice for any G3 residual contract blockers left after enrichment-request and export-plan closure work.
Fixed Input Bucket
Residual G3 / paginated_enrichment bucket after the first two Route 2 child plans.
Allowed Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rssrc/generated_scene/ir.rstests/scene_generator_test.rs- route-local residual inventory and report assets
Forbidden Files
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json- Route 3+ implementation assets
Tasks
- freeze post-Route-2 residual inventory
- group residual blockers
- implement at most one bounded residual correction slice
- rerun bounded validation
- declare Route 2 complete or deferred
Expected Coverage Delta
- shrink or explicitly name the final residual
G3bucket - produce a clean handoff into Route 3
Completion Criteria
- Route 2 is no longer open-ended
- remaining residual
G3records are explicitly categorized
Stop Statement
Stop after Route 2 is explicitly closed or deferred.
Do not begin Route 3 work under this plan.