Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-callback-semantics-closure-report.md

778 B

G6 Host-Bridge Callback Semantics Closure Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-callback-semantics-plan.md

Result

This plan is closed with one bounded callback completion model:

  1. ok
  2. partial
  3. blocked
  4. error

What Was Closed

  1. G6 callback completion logic is no longer implicit
  2. the bounded state priority is now explicit
  3. one bounded follow-up design + plan now exists

Hold Result

The following direction remains untouched:

  1. G8 local-doc prerequisites

Next Step

Execute the bounded G6 host-bridge callback state verification plan rather than reopening this callback-semantics slice.