Files
claw/docs/superpowers/reports/2026-04-19-post-g7-boundary-decision-report.md

1.2 KiB

Post-G7 Boundary Decision Report

Date: 2026-04-19 Roadmap: 2026-04-19-post-g7-boundary-decision-roadmap-plan.md

Decision

One bounded next direction is selected:

  1. prerequisites-only hold

The following boundary families remain held:

  1. G6
  2. G8

Comparison Result

G6

G6 still needs stronger host-bridge real execution semantics than the current bounded next-step budget allows.

So G6 remains held.

G8

G8 still needs local document runtime and attachment handling beyond current repo-local coverage.

So G8 remains held.

Prerequisites-Only Hold

After G7 has already closed as an executed boundary-family sample, the safest bounded next step is no longer another direct family-entry attempt.

The smaller next direction is to scope the remaining prerequisites first.

So prerequisites-only hold is selected.

Result

The roadmap now has one bounded next direction:

  1. boundary runtime prerequisites roadmap

This report does not implement any prerequisite.

It only closes the post-G7 boundary ambiguity.