Files
claw/docs/superpowers/specs/2026-04-19-102-full-coverage-followup-sweep-and-reconciliation-design.md

2.2 KiB

102 Full Coverage Follow-Up Sweep And Reconciliation Design

Date: 2026-04-19 Status: Draft Parent Framework Plan: docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md Parent Child Sequence: docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-child-plan-sequence-plan.md Parent Layer: Layer E

Intent

Run one full 102-scene follow-up sweep after Routes 2 through 6 are complete, then publish a reconciliation candidate view governed by the Route 6 promotion policy.

This design measures cumulative coverage delta. It does not directly update the official execution board.

Inputs

  1. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
  2. Route 2 follow-up assets
  3. Route 3 follow-up assets
  4. Route 4 follow-up assets
  5. Route 5 boundary decisions
  6. Route 6 promotion policy

Output Assets

  1. tests/fixtures/generated_scene/full_coverage_followup_sweep_2026-04-19.json
  2. tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json
  3. docs/superpowers/reports/2026-04-19-102-full-coverage-followup-sweep-report.md
  4. docs/superpowers/reports/2026-04-19-102-full-coverage-reconciliation-candidates-report.md

Status Model

The sweep must report:

  1. auto-pass
  2. fail-closed-known
  3. adjudicated-valid-host-bridge
  4. source-unreadable
  5. missing-source
  6. unsupported-family
  7. misclassified-unresolved

The reconciliation candidate view must also report:

  1. framework-auto-pass-candidate
  2. framework-structured-fail-closed
  3. framework-valid-host-bridge
  4. hygiene-pass-candidate
  5. hygiene-fail-closed-candidate

Guardrails

  1. Do not modify src/generated_scene/analyzer.rs.
  2. Do not modify src/generated_scene/generator.rs.
  3. Do not update tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json.
  4. Do not promote scenes directly.
  5. Do not open a new family.
  6. Do not start implementation work from the sweep result.

Completion Criteria

  1. A fixed 102-scene sweep result exists.
  2. A reconciliation candidate asset exists.
  3. Coverage delta is reported against the previous structured follow-up baseline.
  4. The report states the remaining gap to the 102-scene target.