Files
claw/docs/superpowers/reports/2026-04-18-g3-batch-closure-report.md

1.3 KiB

G3 Batch Closure Report

Status: Completed Date: 2026-04-18 Plan: 2026-04-17-scene-skill-60-to-90-roadmap-plan.md

Intent

Consume the remaining G3 downstream candidates within the existing paginated-enrichment family contract and close the current Track C queue.

Delivered

  1. Added five more G3 paginated-enrichment expansion fixtures:
    • device monitor weekly
    • customer satisfaction daily
    • repair return analysis
    • repair daily control
    • business stats
  2. Added deterministic request-template coverage and generation regressions for all five fixtures
  3. Promoted all remaining current downstream G3 candidates into formal batch expansion baselines
  4. Synchronized family manifest, family results, ledger overlay, and roadmap execution status

Acceptance

  1. all promoted fixtures remain inside paginated_enrichment
  2. all promoted fixtures reuse ticketNo as join key
  3. aggregate rules stay within existing aggregate:riskLevel and aggregate:sourceType scope
  4. Track C remaining queue is now empty

Notes

This closes the current repo-local G3 batch within the roadmap boundary. It does not introduce a new archetype, runtime family, or external validation scope.