2.8 KiB
Scene Skill 102 Pseudo-Production Batch Selection Report
Date: 2026-04-20 Plan:
2026-04-20-scene-skill-102-pseudoprod-batch-selection-plan.md
Scope
This is selection-only. It did not run browser automation, access real networks, use production credentials, modify generated skill packages, or update the official board.
Summary
| Metric | Count |
|---|---|
| Total scenes | 102 |
| Eligible pseudo-prod-ready | 70 |
| Selected first batch | 10 |
| Deferred | 92 |
Selected By Archetype
| Archetype | Count |
|---|---|
paginated_enrichment |
4 |
multi_mode_request |
2 |
single_request_enrichment |
2 |
multi_endpoint_inventory |
1 |
page_state_eval |
1 |
Selected Scenes
| Scene ID | Scene Name | Archetype | Deterministic Input |
|---|---|---|---|
sweep-001-scene |
95598、12398、流程超期风险工单明细 | paginated_enrichment |
95598、12398、流程超期风险工单明细??? |
sweep-002-scene |
95598、12398及配网设备监控情况周统计 | paginated_enrichment |
95598、12398及配网设备监控情况周统计??? |
sweep-003-scene |
95598业务处理满意率统计日报 | paginated_enrichment |
95598业务处理满意率统计日报??? |
sweep-004-scene |
95598供电服务月报 | paginated_enrichment |
95598供电服务月报??? |
sweep-020-scene |
供电所线路电量统计 | multi_mode_request |
供电所线路电量统计??? |
sweep-023-scene |
供电质量看板-武威 | multi_mode_request |
供电质量看板-武威??? |
sweep-013-scene |
业扩报装质量评价体系 | single_request_enrichment |
业扩报装质量评价体系??? |
sweep-016-scene |
供电可靠性指标完成情况统计 | single_request_enrichment |
供电可靠性指标完成情况统计??? |
sweep-084-scene |
计量数据助手 | multi_endpoint_inventory |
计量数据助手??? |
sweep-066-scene |
用户停电频次分析监测 | page_state_eval |
用户停电频次分析监测??? |
Required Evidence
Each selected scene must collect console log, network log or request summary, screenshot when a browser target page is required, exported file if produced, generation report reference, deterministic invocation input, and final execution classification.
Deferred Scope
host_bridge_workflow and local_doc_pipeline are excluded from this first batch because they require real-environment dependencies. Eligible-but-not-selected scenes remain available for later pseudo-production batches.
Next Step
The next bounded plan should be pseudo-production batch execution preparation for these 10 selected scenes. It should still avoid storing credentials in the repository and should define environment handoff requirements before any real execution.