Files
claw/docs/superpowers/specs/2026-04-19-final-2-official-board-reconciliation-refresh-design.md

765 B

Final 2 Official Board Reconciliation Refresh Design

Date: 2026-04-19 Parent Sequence: 2026-04-19-final-2-residual-child-plan-sequence-plan.md

Intent

Apply candidate results from either bootstrap normalization or host-bridge runtime roadmap to the official board.

This design is only a refresh layer. It does not decide, rerun, or implement runtime behavior.

Inputs

One or both of:

  1. tests/fixtures/generated_scene/bootstrap_target_normalization_reconciliation_candidates_2026-04-19.json
  2. tests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json

Output

The official board framework summary should reflect the selected residual roadmap result while preserving workbook and business-status fields.