Files
claw/docs/superpowers/reports/2026-04-19-boundary-family-entry-decision-report.md

1.3 KiB

Boundary Family Entry Decision Report

Date: 2026-04-19 Roadmap: 2026-04-19-boundary-family-real-sample-entry-roadmap-plan.md

Decision

One boundary family is selected as the next real-sample entry candidate:

  1. G7

The other boundary families remain held:

  1. G6
  2. G8

Comparison Result

G6

G6 already has a code-backed minimum runtime contract, but the next real-sample step would require host bridge execution semantics.

That prerequisite is still too platform-shaped for the smallest bounded next slice.

G7

G7 already has a minimal runnable runtime contract and only lacks real multi-endpoint aggregation verification.

Among G6/G7/G8, this is the smallest next capability gap.

So G7 is selected.

G8

G8 already has a code-backed minimum runtime contract, but the next real-sample step still depends on local document pipeline runtime and attachment handling.

That remains heavier than the bounded next-step budget.

Result

The roadmap now has one bounded next direction:

  1. G7 real-sample entry

This report does not execute a real sample yet.

It only closes the boundary-family priority ambiguity.