1.2 KiB
1.2 KiB
G2 Residual 2 Readiness Closure Report
Date: 2026-04-19 Plan:
docs/superpowers/plans/2026-04-19-g2-residual-2-readiness-closure-plan.md
Scope
This bounded route inspected and reran the two fixed G2 residual structured fail-closed scenes. It did not enter G1-E, G3, or boundary residual work.
Summary
| Status | Count |
|---|---|
| pass | 2 |
| fail-closed | 0 |
| source-unreadable | 0 |
| unknown | 0 |
Scene Results
| Scene | Status | Readiness | Archetype | Modes | G2 Gates |
|---|---|---|---|---|---|
| 白银线损周报 | pass | A | multi_mode_request | diagnosis | modes=True; request=True; response=True |
| 台区线损大数据-月_周累计线损率统计分析 | pass | A | multi_mode_request | month, week | modes=True; request=True; response=True |
Decision
- The fixed
02and00readiness labels are not remaining contract gaps after route-local rerun. - Both scenes resolve to
multi_mode_requestwith G2 mode, request, and response gates passing. - No additional analyzer or generator implementation change was required by this route.
Stop Statement
The two-scene route-local follow-up and report are published. No G1-E, G3, or boundary residual work is started by this plan.