G6 Host-Bridge Execution Semantics Closure Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-execution-semantics-plan.md

Result

This plan is closed with two bounded semantic seams:

  1. host-bridge-action-invocation
  2. callback-request-completion

What Was Closed

  1. G6 no longer carries a single broad semantic gap
  2. the minimum semantic model is now explicit
  3. one bounded follow-up design + plan now exists

Hold Result

The following direction remains untouched:

  1. G8 local-doc prerequisites

Next Step

Execute the bounded G6 host-bridge callback semantics plan rather than reopening this semantic slice.