458 B
458 B
102 Framework Closure Rollup Design
Date: 2026-04-19 Parent Sequence:
2026-04-19-final-2-residual-child-plan-sequence-plan.md
Intent
Publish the final framework-level status for all 102 scenes after the final-2 residual sequence.
This is a reporting layer, not an implementation layer.
Closure States
The rollup must distinguish:
- full framework auto-pass
- named structured hold
- unresolved status
The target is unresolved = 0.