1.3 KiB
Boundary Family Entry Decision Report
Date: 2026-04-19 Roadmap: 2026-04-19-boundary-family-real-sample-entry-roadmap-plan.md
Decision
One boundary family is selected as the next real-sample entry candidate:
G7
The other boundary families remain held:
G6G8
Comparison Result
G6
G6 already has a code-backed minimum runtime contract, but the next real-sample step would require host bridge execution semantics.
That prerequisite is still too platform-shaped for the smallest bounded next slice.
G7
G7 already has a minimal runnable runtime contract and only lacks real multi-endpoint aggregation verification.
Among G6/G7/G8, this is the smallest next capability gap.
So G7 is selected.
G8
G8 already has a code-backed minimum runtime contract, but the next real-sample step still depends on local document pipeline runtime and attachment handling.
That remains heavier than the bounded next-step budget.
Result
The roadmap now has one bounded next direction:
G7 real-sample entry
This report does not execute a real sample yet.
It only closes the boundary-family priority ambiguity.