Scene Skill 102 Final Materialization Report

Date: 2026-04-19 Plan: 2026-04-19-scene-skill-102-final-materialization-plan.md

Scope

This plan materialized the final skill package set for the current 102 scene framework closure.

Existing examples/* follow-up roots were not cleaned or modified. The final materialization was written to:

D:/data/ideaSpace/rust/sgClaw/claw-new/examples/scene_skill_102_final_materialization_2026-04-19

Summary

Metric Count
total scenes 102
attempted 102
generated skill directories 102
required file checks passed 101
failures 1

Duration: 2036.246 seconds

Readiness Distribution

Readiness Count
A 100
C 2

Archetype Distribution

Archetype Count
host_bridge_workflow 27
local_doc_pipeline 5
multi_endpoint_inventory 2
multi_mode_request 10
page_state_eval 2
paginated_enrichment 51
single_request_enrichment 5

Assets

  • tests/fixtures/generated_scene/scene_skill_102_final_materialization_manifest_2026-04-19.json
  • tests/fixtures/generated_scene/scene_skill_102_final_materialization_failures_2026-04-19.json
  • D:/data/ideaSpace/rust/sgClaw/claw-new/examples/scene_skill_102_final_materialization_2026-04-19

Failures

Scene id Scene name Error Missing files
sweep-012-scene 业扩报装管理制度 generator-exit-nonzero SKILL.toml, SKILL.md, scene.toml, scripts/*

Closure

This materialization plan published the required final materialization assets: a 102-row manifest, an explicit failures asset, the isolated output root, and this report.

The final materialized skill asset set is not yet 102/102 complete because sweep-012-scene failed package materialization and is missing SKILL.toml, SKILL.md, scene.toml, and scripts/*.

Next work should not start static/mock validation yet. It should first use a separate bounded recovery plan for sweep-012-scene, then refresh this final materialization manifest. This plan does not perform recovery, static, mock, or production validation.