2.0 KiB
2.0 KiB
G6 Host Bridge Workflow Plan
Date: 2026-04-18 Status: Initial implementation slice
Plan Intent
Start the G6 line after G1-E second-sample reuse has been validated.
This plan implements the first safe slice only: classification, evidence separation, readiness gates, and fail-closed behavior.
Phase 0: Boundary Freeze
Tasks:
- keep
电能表现场检验完成率指标报表as the P0 boundary sample - define the repo-local representative fixture
- keep
G6separate fromG1,G1-E,G3,G7, andG8
Deliverables:
G6design docG6plan doc- repo-local representative fixture
Acceptance criteria:
G6is no longer discussed as aG1candidateG6is not treated as a generic localhost-pollution case
Phase 1: Analyzer Classification
Tasks:
- add
host_bridge_workflowas a workflow archetype - detect explicit host bridge actions
- keep
localhost:*as supporting host-runtime evidence - ensure explicit host bridge signals outrank
G1-E - ensure ordinary localhost export noise does not become
G6
Acceptance criteria:
g6_host_bridge_workflowfixture classifies ashost_bridge_workflowbootstrap_localhost_pollutionremains a non-G6 business scene
Phase 2: Fail-Closed Gate
Tasks:
- add readiness risks for missing or unsupported G6 contract
- add
g6_host_bridge_detected - add
g6_fail_closed - block generation before runnable output
Acceptance criteria:
G6generation returns a controlled error- error message includes
host_bridge_workflow - no pseudo-runnable skill is produced
Phase 3: Regression
Tasks:
- run scene generator regression
- run family regression
- run family policy regression
- run canonical regression
Acceptance criteria:
- all target regressions pass
- no
G1-E/G3/G2behavior regresses
Next Step
After this safe G6 slice, continue to G7 多接口盘点汇总型 boundary assessment unless G6 runtime implementation becomes the selected priority.