1.3 KiB
1.3 KiB
102 Framework Closure Rollup Plan
Date: 2026-04-19 Parent Framework:
2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Sequence:2026-04-19-final-2-residual-child-plan-sequence-plan.mdStatus: Draft
Plan Intent
Publish the final 102-scene framework closure rollup after the final-2 residual roadmaps and board refresh are complete.
Fixed Inputs
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json- optional
tests/fixtures/generated_scene/final_2_official_board_reconciliation_refresh_2026-04-19.json
Allowed Files
tests/fixtures/generated_scene/scene_skill_102_framework_closure_rollup_2026-04-19.jsondocs/superpowers/reports/2026-04-19-scene-skill-102-framework-closure-rollup-report.md
Forbidden Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rstests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
Tasks
- Load official board.
- Count framework statuses.
- List any remaining structured fail-closed scenes and their named next actions.
- Verify unresolved count is zero.
- Publish closure rollup JSON and report.
Expected Delta
No implementation delta. This is the final reporting layer.
Stop Statement
Stop after publishing the 102 framework closure rollup. Do not start another runtime roadmap under this plan.