1.8 KiB
1.8 KiB
Final 2 Official Board Reconciliation Refresh Plan
Date: 2026-04-19 Parent Framework:
2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Sequence:2026-04-19-final-2-residual-child-plan-sequence-plan.mdStatus: Draft
Plan Intent
Refresh official board framework fields after one or both final-2 residual roadmaps publish reconciliation candidates.
Fixed Inputs
At least one of:
tests/fixtures/generated_scene/bootstrap_target_normalization_reconciliation_candidates_2026-04-19.jsontests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json
Also required:
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.jsontests/fixtures/generated_scene/promotion_board_reconciliation_policy_2026-04-19.json
Allowed Files
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.jsontests/fixtures/generated_scene/final_2_official_board_reconciliation_refresh_2026-04-19.jsondocs/superpowers/reports/2026-04-19-final-2-official-board-reconciliation-refresh-report.md
Forbidden Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rs
Tasks
- Load candidate assets that exist.
- Verify each candidate belongs to
sweep-085-sceneorsweep-091-scene. - Match board rows by
sceneId. - Update only framework-layer fields.
- Recompute board framework summary.
- Publish reconciliation refresh JSON and report.
Expected Delta
Delta depends on candidate assets:
- one closed residual:
framework-auto-pass +1,framework-structured-fail-closed -1 - both closed residuals:
framework-auto-pass +2,framework-structured-fail-closed -2 - held residuals: no count delta, but narrower next action / hold reason
Stop Statement
Stop after the final-2 board reconciliation refresh JSON and report are published.