Files
claw/docs/superpowers/reports/2026-04-19-g2-residual-2-readiness-closure-report.md

1.2 KiB

G2 Residual 2 Readiness Closure Report

Date: 2026-04-19 Plan: docs/superpowers/plans/2026-04-19-g2-residual-2-readiness-closure-plan.md

Scope

This bounded route inspected and reran the two fixed G2 residual structured fail-closed scenes. It did not enter G1-E, G3, or boundary residual work.

Summary

Status Count
pass 2
fail-closed 0
source-unreadable 0
unknown 0

Scene Results

Scene Status Readiness Archetype Modes G2 Gates
白银线损周报 pass A multi_mode_request diagnosis modes=True; request=True; response=True
台区线损大数据-月_周累计线损率统计分析 pass A multi_mode_request month, week modes=True; request=True; response=True

Decision

  • The fixed 02 and 00 readiness labels are not remaining contract gaps after route-local rerun.
  • Both scenes resolve to multi_mode_request with G2 mode, request, and response gates passing.
  • No additional analyzer or generator implementation change was required by this route.

Stop Statement

The two-scene route-local follow-up and report are published. No G1-E, G3, or boundary residual work is started by this plan.