1.9 KiB
Host-Bridge Runtime Roadmap Report
Date: 2026-04-19 Plan:
2026-04-19-host-bridge-runtime-roadmap-plan.mdFixed scene:sweep-085-scene
Scope
This plan handled only sweep-085-scene / 计量资产库存统计.
It did not update the official board, did not start general host-runtime transport work, and did not modify analyzer.rs or generator.rs.
Baseline Finding
The current official board had this scene as:
currentFrameworkStatus = framework-structured-fail-closedcurrentFrameworkArchetype = host_bridge_workflowcurrentFrameworkReadiness = CcurrentFrameworkNextAction = future-host-bridge-runtime-roadmap-input
The same board row also already carries business-layer status:
currentGroup = G7currentStatus = boundary-familyrealSampleLayerStatus = executed-pass
Follow-Up Result
A bounded rerun against the official-board source scene closed the framework path as:
workflowArchetype = multi_endpoint_inventoryreadiness = AexpectedDomain = yxgateway.gs.sgcc.com.cntargetUrl = http://yxgateway.gs.sgcc.com.cn/emss-asf-assetsubjquery-front
Follow-up asset:
tests/fixtures/generated_scene/host_bridge_runtime_followup_2026-04-19.json
| Scene id | Scene name | Archetype | Readiness | Result |
|---|---|---|---|---|
sweep-085-scene |
计量资产库存统计 |
multi_endpoint_inventory |
A |
auto-pass |
Reconciliation Candidate
Candidate asset:
tests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json
The scene is now published as:
framework-auto-pass-candidate
Per promotion policy, the official board must be updated by a dedicated final-2 board reconciliation refresh, not by this roadmap.
Closure
This roadmap is complete. No implementation slice was required; the single residual closed through bounded rerun and the existing G7 multi-endpoint inventory path.