705 B
705 B
Host-Bridge Runtime Roadmap Design
Date: 2026-04-19 Parent Sequence:
2026-04-19-final-2-residual-child-plan-sequence-plan.mdFixed Scene:sweep-085-scene
Intent
Close or narrow the remaining host-bridge runtime residual without resurrecting the old G6 semantics micro-plan chain.
Fixed Scope
Only sweep-085-scene is in scope.
Minimal Success Definition
The scene must either:
- become
framework-auto-pass-candidate; or - remain
framework-structured-fail-closedwith a narrower named host-bridge runtime hold.
Forbidden Scope
- no general host-runtime transport implementation
- no new G6 semantics micro-plan
- no changes to G1-E/G2/G3 routes
- no new family