Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-gate-closure-report.md

29 lines
755 B
Markdown

# G6 Host-Bridge Entry Gate Closure Report
> Date: 2026-04-19
> Plan: [2026-04-19-g6-host-bridge-entry-gate-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-entry-gate-plan.md)
## Result
This plan is closed with one bounded future entry gate model:
1. three hard gate conditions
2. two soft conditions
3. three fail-close reasons
## What Was Closed
1. `G6` future entry gate is now explicit
2. hard vs soft conditions are now separated
3. one bounded follow-up `design + plan` now exists
## Hold Result
The following direction remains untouched:
1. `G8 local-doc prerequisites`
## Next Step
Execute the bounded `G6 host-bridge entry gate verification` plan rather than reopening this gate slice.