# G6 Host-Bridge Entry Readiness Closure Report
|
|
|
|
> Date: 2026-04-19
|
|
> Plan: [2026-04-19-g6-host-bridge-entry-readiness-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-entry-readiness-plan.md)
|
|
|
|
## Result
|
|
|
|
This plan is closed with one bounded semantic-readiness threshold:
|
|
|
|
1. `semantic-ready`
|
|
|
|
## What Was Closed
|
|
|
|
1. `G6` future entry prerequisites are now split into required vs optional-later
|
|
2. the minimum readiness threshold is now explicit
|
|
3. one bounded follow-up `design + plan` now exists
|
|
|
|
## Hold Result
|
|
|
|
The following direction remains untouched:
|
|
|
|
1. `G8 local-doc prerequisites`
|
|
|
|
## Next Step
|
|
|
|
Execute the bounded `G6 host-bridge entry gate` plan rather than reopening this readiness slice.
|