2.4 KiB
G6 Real-Sample Entry Preparation And Bounded Execution Closure Report
Date: 2026-04-19 Plan:
docs/superpowers/plans/2026-04-19-g6-real-sample-entry-preparation-and-bounded-execution-plan.mdStatus: Closed
Scope
This report closes the unified G6 bounded execution plan.
The execution stayed inside the plan boundary:
- no new
G6semantic sub-plan was created - no
G7orG8implementation was reopened - no
G4 / G5scope was opened - only one fixed
G6real sample was executed
Fixed Sample
电能表现场检验完成率指标报表
Source:
D:/desk/智能体资料/全量业务场景/一平台场景/电能表现场检验完成率指标报表
Generated package:
examples/g6_real_sample_validation/skills/g6-real-meter-inspection-completion
Implementation Slice
The bounded implementation slice corrected the real-sample routing boundary:
- the fixed mixed sample no longer collapses into
local_doc_pipeline faultYoYExportXLSXandfaultDetailsExportXLSXSno longer forceG8classification by themselves- the fixed host-bridge plus callback plus business-endpoint sample stays on
host_bridge_workflow
No generic host-runtime platform redesign was introduced.
Execution Result
The fixed sample was rerun with:
cargo run --bin sg_scene_generate -- --source-dir "D:/desk/智能体资料/全量业务场景/一平台场景/电能表现场检验完成率指标报表" --scene-id g6-real-meter-inspection-completion --scene-name "电能表现场检验完成率指标报表" --scene-kind report_collection --output-root "D:/data/ideaSpace/rust/sgClaw/claw-new/examples/g6_real_sample_validation"
Observed result:
workflowArchetype = host_bridge_workflowreadiness.level = Ag6_host_bridge_detected = passedg6_fail_closed = passed
Final validation state:
executed-pass
Validation Writeback
The following assets were updated:
tests/fixtures/generated_scene/real_sample_validation_records_2026-04-18.jsontests/fixtures/generated_scene/scene_execution_board_2026-04-18.jsontests/fixtures/generated_scene/boundary_runtime_entry_rules_2026-04-18.json
rsv-g6-001 is now recorded as the bounded real-sample execution record for G6.
Closure
This line is closed under the non-negotiable stop rule in the plan.
Do not create another G6 semantic micro-plan from this result.
Any future G6 work must start from a new bounded implementation or validation roadmap.