Files
claw/docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md

151 lines
3.9 KiB
Markdown

# Structured Fail-Closed Residual 13 Closure Plan
> Date: 2026-04-19
> Status: Draft
> Parent Framework: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md`
> Upstream Design: `docs/superpowers/specs/2026-04-19-structured-fail-closed-residual-13-closure-design.md`
> Fixed Input: `tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json`
## Plan Intent
Turn the remaining `13` `framework-structured-fail-closed` scenes into a controlled residual closure sequence.
This plan is a coordinator plan. It does not directly implement code. Implementation must happen only in bounded child plans declared below.
## Fixed Input Bucket
The fixed input bucket is the `13` scenes with:
`reconciliationCandidateStatus = framework-structured-fail-closed`
from:
`tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json`
## Residual Routes
### Residual Route A: G3 Residual Closure
Fixed input:
1. `sweep-007-scene` / `95598供电服务月报`
2. `sweep-039-scene` / `故障报修工单信息统计表`
3. `sweep-068-scene` / `输变电设备运行分析报告`
4. `sweep-084-scene` / `巡视计划完成情况自动检索`
Expected child plan:
`2026-04-19-g3-residual-4-workflow-evidence-closure-plan.md`
Allowed implementation area:
1. G3 workflow evidence recovery.
2. G3 contract assembly.
3. bounded G3 route-local validation.
Forbidden:
1. G8 runtime.
2. G6 host bridge runtime.
3. new family creation.
### Residual Route B: G2 Residual Closure
Fixed input:
1. `sweep-018-scene` / `白银线损周报`
2. `sweep-071-scene` / `台区线损大数据-月_周累计线损率统计分析`
Expected child plan:
`2026-04-19-g2-residual-2-readiness-closure-plan.md`
Allowed implementation area:
1. G2 readiness interpretation.
2. G2 mode/request/response contract correction.
3. bounded G2 route-local validation.
Forbidden:
1. changing G2 real-sample pass semantics;
2. adding a new G2 variant family;
3. route drift into host bridge.
### Residual Route C: Boundary Residual Decision
Fixed input:
1. `sweep-033-scene` / `供电可靠率指标统计表`
2. `sweep-034-scene` / `供电可靠性数据质量自查报告月报`
3. `sweep-042-scene` / `国网金昌供电公司营商环境周例会报告`
4. `sweep-051-scene` / `嘉峪关可靠性分析报告`
5. `sweep-074-scene` / `同兴智能安全督查日报`
6. `sweep-085-scene` / `业扩报装管理制度`
Expected child plan:
`2026-04-19-boundary-residual-hold-decision-plan.md`
Allowed action:
1. decision-only hold/defer classification.
2. no implementation.
### Residual Route D: Bootstrap Residual Isolation
Fixed input:
1. `sweep-091-scene` / `用户停电频次分析监测`
Expected child plan:
`2026-04-19-bootstrap-target-residual-isolation-plan.md`
Allowed action:
1. bootstrap target isolation.
2. no login recovery implementation.
### Residual Route E: Residual Follow-Up Reconciliation
Expected child plan:
`2026-04-19-residual-13-followup-sweep-and-reconciliation-plan.md`
Allowed action:
1. route-local or fixed 13-scene follow-up sweep.
2. reconciliation candidate refresh.
3. no official board update.
## Phase Order
1. Run Residual Route A.
2. Run Residual Route B.
3. Run Residual Route C.
4. Run Residual Route D.
5. Run Residual Route E.
Do not skip to Route E before Routes A through D are complete.
## Deliverables
1. residual 13 design.
2. residual 13 coordinator plan.
3. child bounded plans for Routes A through E.
## Completion Criteria
1. the 13 residual scenes are fully assigned to residual routes;
2. every residual route has an expected child plan name;
3. mainline residuals are separated from boundary/bootstrap residuals;
4. no implementation is performed directly by this coordinator plan.
## Stop Statement
Stop after publishing this coordinator plan and its child plan skeletons.
Do not modify implementation files under this coordinator plan.