35 lines
1.2 KiB
Markdown
35 lines
1.2 KiB
Markdown
# G2 Residual 2 Readiness Closure Report
|
|
|
|
> Date: 2026-04-19
|
|
> Plan: `docs/superpowers/plans/2026-04-19-g2-residual-2-readiness-closure-plan.md`
|
|
|
|
## Scope
|
|
|
|
This bounded route inspected and reran the two fixed G2 residual structured fail-closed scenes. It did not enter G1-E, G3, or boundary residual work.
|
|
|
|
## Summary
|
|
|
|
| Status | Count |
|
|
| --- | ---: |
|
|
| pass | 2 |
|
|
| fail-closed | 0 |
|
|
| source-unreadable | 0 |
|
|
| unknown | 0 |
|
|
|
|
## Scene Results
|
|
|
|
| Scene | Status | Readiness | Archetype | Modes | G2 Gates |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 白银线损周报 | pass | A | multi_mode_request | diagnosis | modes=True; request=True; response=True |
|
|
| 台区线损大数据-月_周累计线损率统计分析 | pass | A | multi_mode_request | month, week | modes=True; request=True; response=True |
|
|
|
|
## Decision
|
|
|
|
- The fixed `02` and `00` readiness labels are not remaining contract gaps after route-local rerun.
|
|
- Both scenes resolve to `multi_mode_request` with G2 mode, request, and response gates passing.
|
|
- No additional analyzer or generator implementation change was required by this route.
|
|
|
|
## Stop Statement
|
|
|
|
The two-scene route-local follow-up and report are published. No G1-E, G3, or boundary residual work is started by this plan.
|