34 lines
1.3 KiB
Markdown
34 lines
1.3 KiB
Markdown
# Final Skill Human-Readable Index Report
|
|
|
|
> Date: 2026-04-20
|
|
> Plan: `2026-04-20-final-skill-human-readable-index-plan.md`
|
|
|
|
## Scope
|
|
|
|
This plan added human-readable lookup and metadata to the final materialized skill set. It did not rerun generation, repair failed packages, update the official execution board, or modify generated scripts.
|
|
|
|
## Outputs
|
|
|
|
- `examples/scene_skill_102_final_materialization_2026-04-19/SCENE_INDEX.md`
|
|
- `examples/scene_skill_102_final_materialization_2026-04-19/scene_skill_102_index.json`
|
|
- updated complete package `SKILL.toml` files with `display_name`, `scene_id`, `scene_name`, `archetype`, and `readiness`
|
|
- updated complete package `SKILL.md` files with readable scene summaries
|
|
|
|
## Summary
|
|
|
|
| Metric | Count |
|
|
| --- | ---: |
|
|
| total scenes | 102 |
|
|
| materialized skill packages | 101 |
|
|
| failed packages | 1 |
|
|
| metadata updated | 101 |
|
|
| metadata skipped | 1 |
|
|
|
|
## Remaining Blocker
|
|
|
|
`sweep-012-scene / ????????` still lacks a complete skill package and was skipped for per-skill metadata normalization. It remains the input for a separate bounded materialization recovery plan.
|
|
|
|
## Closure
|
|
|
|
The human-readable index and metadata normalization plan is complete. The next step remains a bounded recovery plan for `sweep-012-scene` before static or mock validation starts.
|