Boundary Runtime Prerequisites Roadmap Design
Date: 2026-04-19 Status: Draft Upstream Decision: 2026-04-19-post-g7-boundary-decision-report.md
1. Intent
This design defines the next bounded slice after the post-G7 boundary decision selects prerequisites-only hold.
The target is:
boundary runtime prerequisites roadmap
2. Why This Direction
This direction is selected because:
G7is already closed and should not be reopenedG6still depends on stronger host-bridge real execution semanticsG8still depends on local document runtime and attachment handling- forcing either family into execution now would exceed the bounded next-step budget
3. Scope Boundary
This design is limited to prerequisite scoping only.
It may include:
- separating
G6prerequisite pressure fromG8prerequisite pressure - defining the minimum prerequisite slice needed before either family can enter real-sample scope
- selecting one bounded prerequisite direction
It must not include:
- executing
G6orG8 - implementing host-runtime or local-doc runtime directly
- reopening
G7 - reopening
G1-E / G2 / G3 - opening
G4 / G5
4. Target Outcome
The bounded target outcome is one of two states:
- a selected prerequisite direction for
G6 - or a selected prerequisite direction for
G8
The design rejects direct family execution under this slice.
5. Exit Condition
This design is complete when implementation can be bounded to one roadmap that:
- compares
G6andG8prerequisite burden directly - selects exactly one prerequisite direction
- publishes one bounded follow-up plan