Files
claw/docs/superpowers/reports/2026-04-18-g3-batch-closure-report.md

33 lines
1.3 KiB
Markdown

# G3 Batch Closure Report
> Status: Completed
> Date: 2026-04-18
> Plan: [2026-04-17-scene-skill-60-to-90-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-17-scene-skill-60-to-90-roadmap-plan.md)
## Intent
Consume the remaining `G3` downstream candidates within the existing paginated-enrichment family contract and close the current Track C queue.
## Delivered
1. Added five more `G3` paginated-enrichment expansion fixtures:
- device monitor weekly
- customer satisfaction daily
- repair return analysis
- repair daily control
- business stats
2. Added deterministic request-template coverage and generation regressions for all five fixtures
3. Promoted all remaining current downstream `G3` candidates into formal batch expansion baselines
4. Synchronized family manifest, family results, ledger overlay, and roadmap execution status
## Acceptance
1. all promoted fixtures remain inside `paginated_enrichment`
2. all promoted fixtures reuse `ticketNo` as join key
3. aggregate rules stay within existing `aggregate:riskLevel` and `aggregate:sourceType` scope
4. `Track C` remaining queue is now empty
## Notes
This closes the current repo-local `G3` batch within the roadmap boundary. It does not introduce a new archetype, runtime family, or external validation scope.