58 lines
1.7 KiB
Markdown
58 lines
1.7 KiB
Markdown
# Boundary Runtime Prerequisites Roadmap Design
|
|
|
|
> Date: 2026-04-19
|
|
> Status: Draft
|
|
> Upstream Decision: [2026-04-19-post-g7-boundary-decision-report.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/reports/2026-04-19-post-g7-boundary-decision-report.md)
|
|
|
|
## 1. Intent
|
|
|
|
This design defines the next bounded slice after the post-`G7` boundary decision selects `prerequisites-only hold`.
|
|
|
|
The target is:
|
|
|
|
`boundary runtime prerequisites roadmap`
|
|
|
|
## 2. Why This Direction
|
|
|
|
This direction is selected because:
|
|
|
|
1. `G7` is already closed and should not be reopened
|
|
2. `G6` still depends on stronger host-bridge real execution semantics
|
|
3. `G8` still depends on local document runtime and attachment handling
|
|
4. forcing either family into execution now would exceed the bounded next-step budget
|
|
|
|
## 3. Scope Boundary
|
|
|
|
This design is limited to prerequisite scoping only.
|
|
|
|
It may include:
|
|
|
|
1. separating `G6` prerequisite pressure from `G8` prerequisite pressure
|
|
2. defining the minimum prerequisite slice needed before either family can enter real-sample scope
|
|
3. selecting one bounded prerequisite direction
|
|
|
|
It must not include:
|
|
|
|
1. executing `G6` or `G8`
|
|
2. implementing host-runtime or local-doc runtime directly
|
|
3. reopening `G7`
|
|
4. reopening `G1-E / G2 / G3`
|
|
5. opening `G4 / G5`
|
|
|
|
## 4. Target Outcome
|
|
|
|
The bounded target outcome is one of two states:
|
|
|
|
1. a selected prerequisite direction for `G6`
|
|
2. or a selected prerequisite direction for `G8`
|
|
|
|
The design rejects direct family execution under this slice.
|
|
|
|
## 5. Exit Condition
|
|
|
|
This design is complete when implementation can be bounded to one roadmap that:
|
|
|
|
1. compares `G6` and `G8` prerequisite burden directly
|
|
2. selects exactly one prerequisite direction
|
|
3. publishes one bounded follow-up plan
|