Files
claw/docs/superpowers/specs/2026-04-19-final-2-official-board-reconciliation-refresh-design.md

22 lines
765 B
Markdown

# Final 2 Official Board Reconciliation Refresh Design
> Date: 2026-04-19
> Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
## Intent
Apply candidate results from either bootstrap normalization or host-bridge runtime roadmap to the official board.
This design is only a refresh layer. It does not decide, rerun, or implement runtime behavior.
## Inputs
One or both of:
1. `tests/fixtures/generated_scene/bootstrap_target_normalization_reconciliation_candidates_2026-04-19.json`
2. `tests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json`
## Output
The official board framework summary should reflect the selected residual roadmap result while preserving workbook and business-status fields.