## 1. Intent
|
|
|
|
This design defines the next bounded slice after `G6 host-bridge entry gate`.
|
|
|
|
The target is:
|
|
|
|
`G6 host-bridge entry gate verification`
|
|
|
|
## 2. Why This Slice
|
|
|
|
The future entry gate is now explicit.
|
|
|
|
The next bounded pressure is:
|
|
|
|
1. verify the gate model itself before any later real-sample entry slice is considered
|
|
|
|
## 3. Scope Boundary
|
|
|
|
This design is limited to gate verification only.
|
|
|
|
It may include:
|
|
|
|
1. defining bounded verification targets for the hard gate
|
|
2. defining how fail-close reasons are checked
|
|
3. defining how gate verification narrows later `G6` entry work
|
|
|
|
It must not include:
|
|
|
|
1. executing a `G6` real sample
|
|
2. implementing host-runtime directly
|
|
3. opening `G8`
|
|
4. reopening `G7`
|
|
|
|
## 4. Target Outcome
|
|
|
|
The bounded target outcome is one state:
|
|
|
|
1. one bounded `G6 host-bridge entry gate verification` plan
|
|
|
|
## 5. Exit Condition
|
|
|
|
This design is complete when implementation can be bounded to one plan that:
|
|
|
|
1. freezes gate-verification scope
|
|
2. defines bounded verification targets
|
|
3. emits one bounded follow-up plan
|