44 lines
1.2 KiB
Markdown
44 lines
1.2 KiB
Markdown
# Final 2 Residual Roadmap Prioritization Plan
|
|
|
|
> Date: 2026-04-19
|
|
> Parent Framework: `2026-04-19-scene-skill-102-full-coverage-framework-plan.md`
|
|
> Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
|
|
> Status: Draft
|
|
|
|
## Plan Intent
|
|
|
|
Select the next residual roadmap from the final two structured fail-closed records.
|
|
|
|
## Fixed Input Bucket
|
|
|
|
1. `sweep-085-scene`: host-bridge runtime residual
|
|
2. `sweep-091-scene`: bootstrap target normalization residual
|
|
|
|
## Allowed Files
|
|
|
|
1. `tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json`
|
|
2. `docs/superpowers/reports/2026-04-19-final-2-residual-roadmap-prioritization-report.md`
|
|
|
|
## Forbidden Files
|
|
|
|
1. `src/generated_scene/analyzer.rs`
|
|
2. `src/generated_scene/generator.rs`
|
|
3. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
|
|
|
## Tasks
|
|
|
|
1. Load the current official board.
|
|
2. Extract the two residuals.
|
|
3. Score bootstrap normalization vs host-bridge runtime.
|
|
4. Select exactly one first roadmap.
|
|
5. Publish decision JSON.
|
|
6. Publish decision report.
|
|
|
|
## Expected Delta
|
|
|
|
No coverage delta. This is a decision-only plan.
|
|
|
|
## Stop Statement
|
|
|
|
Stop after the prioritization asset and report are published. Do not start the selected roadmap under this plan.
|