29 lines
1.2 KiB
Markdown
29 lines
1.2 KiB
Markdown
# G3 Timeout Warning Expansion Report
|
|
|
|
> Status: Completed
|
|
> Date: 2026-04-18
|
|
> Plan: [2026-04-17-scene-skill-60-to-90-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-17-scene-skill-60-to-90-roadmap-plan.md)
|
|
|
|
## Intent
|
|
|
|
Promote one more `G3` downstream candidate within the existing paginated-enrichment family contract, without introducing a new archetype or runtime scope.
|
|
|
|
## Delivered
|
|
|
|
1. Added `tests/fixtures/generated_scene/paginated_enrichment_expansion_timeout_warning`
|
|
2. Added deterministic and generation regressions for the timeout-warning sample
|
|
3. Promoted `ticket_timeout_warning_detail` into the formal `G3` batch expansion baseline
|
|
4. Synchronized family manifest, family results, ledger overlay, and roadmap execution status
|
|
|
|
## Acceptance
|
|
|
|
1. archetype remains `paginated_enrichment`
|
|
2. pagination field is recovered as `pageNum`
|
|
3. join key remains `ticketNo`
|
|
4. aggregate rule remains `aggregate:riskLevel`
|
|
5. `Track C` remaining queue drops from six to five
|
|
|
|
## Notes
|
|
|
|
This promotion stays inside the roadmap boundary because it reuses the existing `G3` family contract and only consumes one downstream candidate from the current batch asset.
|