48 lines
1.2 KiB
Markdown
48 lines
1.2 KiB
Markdown
# Boundary Runtime Prerequisites Decision Report
|
|
|
|
> Date: 2026-04-19
|
|
> Roadmap: [2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md)
|
|
|
|
## Decision
|
|
|
|
One bounded prerequisite direction is selected:
|
|
|
|
1. `G6 host-bridge prerequisites`
|
|
|
|
The following prerequisite direction remains held:
|
|
|
|
1. `G8 local-doc prerequisites`
|
|
|
|
## Comparison Result
|
|
|
|
### G6 Host-Bridge Prerequisites
|
|
|
|
`G6` is blocked by one clearer prerequisite line:
|
|
|
|
1. host bridge real-sample execution semantics
|
|
|
|
That is still platform-shaped, but it is narrower than the combined local-doc burden on `G8`.
|
|
|
|
So `G6 host-bridge prerequisites` is selected.
|
|
|
|
### G8 Local-Doc Prerequisites
|
|
|
|
`G8` is blocked by a broader prerequisite bundle:
|
|
|
|
1. local document runtime
|
|
2. attachment handling
|
|
|
|
That bundle is heavier than the next bounded slice should absorb.
|
|
|
|
So `G8 local-doc prerequisites` remains held.
|
|
|
|
## Result
|
|
|
|
The roadmap now has one bounded next direction:
|
|
|
|
1. `G6 host-bridge prerequisites`
|
|
|
|
This report does not implement the prerequisite.
|
|
|
|
It only closes the prerequisite priority ambiguity.
|