# Boundary Runtime Prerequisites Roadmap Closure Report
|
|
|
|
> Date: 2026-04-19
|
|
> Roadmap: [2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md)
|
|
|
|
## Result
|
|
|
|
This roadmap is closed with one bounded next direction:
|
|
|
|
1. `G6 host-bridge prerequisites`
|
|
|
|
## What Was Closed
|
|
|
|
1. `G6` and `G8` no longer compete ambiguously at the prerequisite level
|
|
2. one follow-up bounded `design + plan` now exists for the selected prerequisite direction
|
|
|
|
## Hold Result
|
|
|
|
The following direction remains held:
|
|
|
|
1. `G8 local-doc prerequisites`
|
|
|
|
The deferred families remain untouched:
|
|
|
|
1. `G4`
|
|
2. `G5`
|
|
|
|
## Next Step
|
|
|
|
Execute the bounded `G6 host-bridge prerequisites` plan rather than reopening this roadmap.
|