Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-readiness-closure-report.md

751 B

G6 Host-Bridge Entry Readiness Closure Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-readiness-plan.md

Result

This plan is closed with one bounded semantic-readiness threshold:

  1. semantic-ready

What Was Closed

  1. G6 future entry prerequisites are now split into required vs optional-later
  2. the minimum readiness threshold is now explicit
  3. one bounded follow-up design + plan now exists

Hold Result

The following direction remains untouched:

  1. G8 local-doc prerequisites

Next Step

Execute the bounded G6 host-bridge entry gate plan rather than reopening this readiness slice.