952 B
952 B
G6 Host-Bridge Entry Readiness Report
Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-readiness-plan.md
Result
This bounded slice defines the minimum semantic readiness required before a future G6 entry slice may open:
host-bridge-action-invocation-definedcallback-request-completion-definedcallback-state-verification-targets-defined
What Was Declared Optional
This slice also makes explicit what is not required yet:
- direct host-runtime transport implementation
- real-sample execution proof
Minimal Threshold
The current bounded threshold is:
semantic-ready
That means G6 can only move into a later bounded entry slice after the semantic model is complete, not after runtime implementation begins.
Follow-Up
The next bounded step is:
G6 host-bridge entry gate