Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-readiness-report.md

952 B

G6 Host-Bridge Entry Readiness Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-readiness-plan.md

Result

This bounded slice defines the minimum semantic readiness required before a future G6 entry slice may open:

  1. host-bridge-action-invocation-defined
  2. callback-request-completion-defined
  3. callback-state-verification-targets-defined

What Was Declared Optional

This slice also makes explicit what is not required yet:

  1. direct host-runtime transport implementation
  2. real-sample execution proof

Minimal Threshold

The current bounded threshold is:

  1. semantic-ready

That means G6 can only move into a later bounded entry slice after the semantic model is complete, not after runtime implementation begins.

Follow-Up

The next bounded step is:

  1. G6 host-bridge entry gate