749 B
749 B
G6 Host-Bridge Prerequisites Closure Report
Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-prerequisites-plan.md
Result
This plan is closed with one bounded blocked capability:
host-bridge-real-execution-semantics
What Was Closed
G6prerequisite pressure is no longer broad or implicit- the minimum missing capability is now explicit
- one bounded follow-up
design + plannow exists
Hold Result
The following direction remains untouched:
G8 local-doc prerequisites
Next Step
Execute the bounded G6 host-bridge execution semantics plan rather than reopening this prerequisites slice.