21 lines
458 B
Markdown
21 lines
458 B
Markdown
# 102 Framework Closure Rollup Design
|
|
|
|
> Date: 2026-04-19
|
|
> Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
|
|
|
|
## Intent
|
|
|
|
Publish the final framework-level status for all 102 scenes after the final-2 residual sequence.
|
|
|
|
This is a reporting layer, not an implementation layer.
|
|
|
|
## Closure States
|
|
|
|
The rollup must distinguish:
|
|
|
|
1. full framework auto-pass
|
|
2. named structured hold
|
|
3. unresolved status
|
|
|
|
The target is `unresolved = 0`.
|