Files
claw/docs/superpowers/reports/2026-04-18-post-roadmap-execution-closure-report.md

83 lines
2.4 KiB
Markdown

# Post-Roadmap Execution Closure Report
> Date: 2026-04-18
> Scope: `docs/superpowers/plans/2026-04-18-scene-skill-post-roadmap-execution-plan.md`
> Result: Completed
## 1. Conclusion
The post-roadmap execution plan has been closed within its own boundary.
The completed outputs now exist for all required phases:
1. Phase 0: handover boundary asset
2. Phase 1: minimum current execution board
3. Phase 2: real-sample validation layer
4. Phase 3: boundary and runtime entry rules
5. Phase 4: bounded next-roadmap design and plan
## 2. Delivered Assets
### Phase 0
1. `tests/fixtures/generated_scene/post_roadmap_handover_2026-04-18.json`
### Phase 1
1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
### Phase 2
1. `tests/fixtures/generated_scene/real_sample_validation_plan_2026-04-18.json`
2. `tests/fixtures/generated_scene/real_sample_validation_record_template_2026-04-18.json`
3. `tests/fixtures/generated_scene/real_sample_validation_records_2026-04-18.json`
4. `tests/fixtures/generated_scene/real_sample_mismatch_taxonomy_2026-04-18.json`
### Phase 3
1. `tests/fixtures/generated_scene/boundary_runtime_entry_rules_2026-04-18.json`
### Phase 4
1. `docs/superpowers/specs/2026-04-18-scene-skill-real-sample-validation-roadmap-design.md`
2. `docs/superpowers/plans/2026-04-18-scene-skill-real-sample-validation-roadmap-plan.md`
## 3. Key Outcome
The most important change is not a new compiler feature.
It is the separation of:
1. frozen workbook snapshot
2. current execution-board state
3. real-sample validation state
4. next-roadmap scope decisions
That separation prevents the next execution round from drifting back into asset-only refinement.
## 4. Real-Sample Validation Status
The first-round validation layer now records:
1. `G2` as an executed mismatch anchor
2. `G1-E` as an executed pass anchor
3. `G3` as a selected real-sample anchor that still needs an executed real run
This means the next roadmap can be validation-first rather than fixture-first.
## 5. Boundary Control
`G6/G7/G8` remain boundary families.
`G4/G5` remain deferred or degraded.
No new implementation scope was opened inside this plan.
## 6. Verification
The post-roadmap execution assets are now covered by:
1. `cargo test --test post_roadmap_execution_assets_test -- --nocapture`
This verification is in addition to the already existing family, ledger, and roadmap asset tests.