Files
claw/docs/superpowers/reports/2026-04-19-final-2-residual-roadmap-prioritization-report.md

52 lines
1.6 KiB
Markdown

# Final 2 Residual Roadmap Prioritization Report
> Date: 2026-04-19
> Plan: `2026-04-19-final-2-residual-roadmap-prioritization-plan.md`
> Parent sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
## Scope
This decision consumed the current official board state after local-doc reconciliation refresh. Only two framework structured fail-closed residuals remain:
| Scene id | Scene name | Current archetype | Next action |
| --- | --- | --- | --- |
| `sweep-085-scene` | `计量资产库存统计` | `host_bridge_workflow` | `future-host-bridge-runtime-roadmap-input` |
| `sweep-091-scene` | `配网异常设备监控统计` | `page_state_eval` | `future-bootstrap-target-normalization-roadmap-input` |
No code was changed, and the official board was not updated by this plan.
## Decision
Selected first roadmap:
`bootstrap target normalization roadmap`
Selected plan:
`2026-04-19-bootstrap-target-normalization-roadmap-plan.md`
## Rationale
Bootstrap target normalization is the narrower next step:
1. It is a single-scene residual.
2. It targets deterministic bootstrap target recovery or a narrower named hold.
3. It avoids host-runtime transport semantics.
4. It has lower regression risk against already passing host-bridge paths.
Host-bridge runtime remains queued:
`2026-04-19-host-bridge-runtime-roadmap-plan.md`
## Output Asset
Decision asset:
`tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json`
## Closure
This prioritization plan is complete. The next executable plan is:
`docs/superpowers/plans/2026-04-19-bootstrap-target-normalization-roadmap-plan.md`