Files
claw/docs/superpowers/specs/2026-04-19-102-framework-closure-rollup-design.md

21 lines
458 B
Markdown

# 102 Framework Closure Rollup Design
> Date: 2026-04-19
> Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
## Intent
Publish the final framework-level status for all 102 scenes after the final-2 residual sequence.
This is a reporting layer, not an implementation layer.
## Closure States
The rollup must distinguish:
1. full framework auto-pass
2. named structured hold
3. unresolved status
The target is `unresolved = 0`.