2.2 KiB
Final 2 Residual Child Plan Sequence Design
Date: 2026-04-19 Parent Framework:
2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Layer:Layer E / Route 5 + Route 6Upstream Board State:framework-auto-pass = 100,framework-structured-fail-closed = 2
Intent
Define the remaining bounded plan sequence after local-doc runtime closure. Only two framework structured fail-closed residuals remain:
sweep-085-scene:host_bridge_workflow, next actionfuture-host-bridge-runtime-roadmap-inputsweep-091-scene:page_state_eval, next actionfuture-bootstrap-target-normalization-roadmap-input
This sequence prevents drift back into prior G6 micro-plans. Every next step must be anchored to this final-2 residual sequence and the 102 full coverage parent framework.
Design Rules
- Do not reuse the old G6 semantics micro-plan chain as an execution path.
- Do not start host-bridge and bootstrap work in the same implementation plan.
- Do not update the official board inside diagnostic or implementation plans.
- Do not add a new family.
- Do not modify unrelated mainline contracts for G1-E, G2, or G3.
- Any implementation must target exactly one residual scene unless a later parent-framework revision expands the fixed input bucket.
Sequence
-
Final 2 Residual Roadmap PrioritizationDecide which residual enters implementation first. -
Bootstrap Target Normalization RoadmapBounded roadmap forsweep-091-scene, if selected by prioritization. -
Host-Bridge Runtime RoadmapBounded roadmap forsweep-085-scene, if selected by prioritization. -
Final 2 Official Board Reconciliation RefreshConsume the selected roadmap output and update only framework-layer board fields. -
102 Framework Closure RollupPublish the final 102-status view after both residuals are closed or explicitly held.
Expected End State
The target end state is one of:
102 framework-auto-pass,0 structured fail-closed101 framework-auto-pass,1 structured fail-closed with named runtime hold100 framework-auto-pass,2 structured fail-closed with named runtime holds
The third state is allowed only if both residuals are explicitly held by bounded decision plans.