Files
claw/docs/superpowers/specs/2026-04-19-g6-host-bridge-entry-gate-design.md

53 lines
1.3 KiB
Markdown

# G6 Host-Bridge Entry Gate Design
> Date: 2026-04-19
> Status: Draft
> Upstream Report: [2026-04-19-g6-host-bridge-entry-readiness-report.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-readiness-report.md)
## 1. Intent
This design defines the next bounded slice after `G6 host-bridge entry readiness`.
The target is:
`G6 host-bridge entry gate`
## 2. Why This Slice
The semantic readiness criteria are now explicit.
The next bounded pressure is:
1. turn those criteria into a bounded future entry gate without opening real execution
## 3. Scope Boundary
This design is limited to gate modeling only.
It may include:
1. defining pass/fail gate conditions for a future `G6` entry slice
2. defining which readiness criteria are hard blockers
3. defining how the gate narrows later real-sample entry
It must not include:
1. executing a `G6` real sample
2. implementing host-runtime directly
3. opening `G8`
4. reopening `G7`
## 4. Target Outcome
The bounded target outcome is one state:
1. one bounded `G6 host-bridge entry gate` plan
## 5. Exit Condition
This design is complete when implementation can be bounded to one plan that:
1. freezes gate-model scope
2. defines bounded gate conditions
3. emits one bounded follow-up plan